Ecoinstrument has a diverse portfolio of projects relating to the environmental markets, analytical laboratory, water and wastewater industries, pharmaceutical markets, petroleum industry,
and semiconductor and electronics manufacturing markets.
There are quite a few companies that are able to implement large-scale projects (including design, timely delivery of the various equipment, the commissioning, personnel training, as well as maintenance and service) in the Russian market of analytical equipment.
After all, for the implementation of such projects the company should have a certain level of experience and sufficient resources.
Ecoinstrument is able to implement projects of any complexity due to high qualification of managers and technical specialists of the company, a wide range of the equipment offered, a network of regional and foreign representative offices, own service center.
Our markets
In supply of the equipment we are focused on the enterprises which are suppliers and consumers of water resources. To some extent, this is almost all industries, but the most important for us should definitely include:
Oil refining and transportation
Food production
Environmental monitoring
Energy and automotive
Water treatment, water supply and wastewater treatment
Implemented industrial projects
The EcoInstrument company is well aware that the successful and efficient operation of water utilities and treatment / drinking water facilities is impossible without accurate and reliable monitoring devices. Therefore, the engineers of our company not only develop projects, but also monitor the delivery,
installation and commissioning of equipment.
Company:
St. Petersburg WSC
Location:
Saint Petersburg, Connolakhtinsky prospekt, 12 bld 2
Facilities:
Northern Aeration Station (NAS)
Tasks:
Reconstruction of Northern Aeration Station (NAS)
Start and end dates:
2006-2007
Equipment and problem solving:
Largest St. Petersburg WWTP in Olgino village was equipped with: 32 oxygen sensors for aerotanks , 6 ammonium and phosphate analyzers in clarified and purified water, sensors of suspended solids for all stages of purification, 12 silt level sensors for secondary sedimentation tanks, automatic samplers.
Results:
Reduction of energy costs for aeration and pumping of sediment, improvement of cleaning quality.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
St. Petersburg WSC
Location:
St. Petersburg, Kirovsky district, Beliy island
Facilities:
Central Aeration Station (CAS)
Tasks:
Automation of Central Aeration Station (CAS)
Start and end dates:
2008
Equipment and problem solving:
In a framework of the project the following equipment was delivered and installed in three reconstructed aeration tanks on island Beliy: 2 sensors of dissolved oxygen, 9 sensors of the sum of nitrates and nitrites, 3 sensors for the concentration of the silt mixture, 3 analyzers of phosphorus, 5 automatic samplers were installed in three reconstructed aerotanks on the Bely Island.
Results:
Optimization of the process of de-nitrification, reduction of phosphate discharge into the Baltic Sea.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Sibur-Neftekhim
Location:
Nizhny Novgorod Region, Dzerzhinsk, East Industrial Zone, Building 390
Facilities:
Treatment facilities
Tasks:
PH control of untreated effluent at «Caprolactam» plant
Start and end dates:
2008
Equipment and problem solving:
The main products of the SIBUR-Neftekhim production are ethylene oxide, ethylene glycols, etc.
These products are used as raw materials for petrochemical and chemical enterprises, as well as for enterprises of other industries.
Therefore, timely neutralization of wastewater is of paramount importance. As a solution to this large-scale problem,
our experts proposed and successfully implemented integration of differential pH sensors with an automatic cleaning system
Results:
Such solution allowed to control neutralization of wastewater as well as to
increase service interval from one week up to 6 months and save sensors lifecycle for several years.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Automation of aerotank aeration system on local treatment plant «Kirishinefteorgsintez» (Kinef)
Start and end dates:
2008-2010
Equipment and problem solving:
The activities of the Surgutneftegas holding cover the entire technological chain from geological
exploration and production of hydrocarbon materials to its processing. Engineers of EcoInstrument provided installation of 14 digital
optical oxygen sensors to monitor the supply of compressed air to the aeration tanks in the presence of sulphides and petroleum products.
Results:
Optimization of the workflow of aeration system and a reduction in operating costs.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Fund of J.Nurmanen, St. Petersburg WSC
Location:
St. Petersburg; Kavalergardskaya St., 42
Facilities:
Wastewater treatment plant on SW WWTP
Tasks:
Monitoring of aerotank operation on SW WWTP
Start and end dates:
2009
Equipment and problem solving:
In framework of the project the following equipment was installed on a pumping station in the
premises of the most modern waste water treatment plants in
the southwest WWTP of St. Petersburg: dual-channel phosphate analyzers, ammonium and nitrate nitrogen with a filtration system of 6 streams.
Results:
Optimization of the process of biological phosphorus removal.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Moscow WSC
Location:
Moscow, Pleteshkovsky Lane, 2
Facilities:
Water pump station
Tasks:
Sewage control on water pump station
Start and end dates:
2009
Equipment and problem solving:
In framework of the project the following equipment was installed in the sewage pumping
station outside the danger zone: a flow chamber with sensors of pH, ORP, conductivity, COD, suspended solids and oil products.
Results:
Optimization of identification of unauthorized discharges by industrial enterprises
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
PJSC Tatneft, Nizhnekamsk
Location:
Republic of Tatarstan, Nizhnekamsk, Sobolekovskaya St., Building 23
Facilities:
Treatment facilities
Tasks:
Monitoring system for chemically contaminated effluents of «Nizhnekamskneftekhim»
Start and end dates:
2009-2010
Equipment and problem solving:
«Nizhnekamskneftekhim» is one of the largest petrochemical companies; it occupies a leading position
in the production of synthetic rubbers and plastics in the Russian Federation. The task, which our experts needed to solve, was control of effluents for
the presence of organic pollutants (oil products). As a solution, was developed and implemented a system,
which includes the use of absorption and luminescence sensors in the UV range (UVAS and FP360), as well as pH, conductivity, and suspended solids.
Results:
Optimization of quality control of industrial wastewater.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Novokuznetsk WSC
Location:
Novokuznetsk, Builders ave., 98
Facilities:
Sewage treatment plant
Tasks:
Automation of blowers and upgrade of sewage treatment plant
Start and end dates:
2009-2013
Equipment and problem solving:
The work was carried out in stages: Stage one: Automation of blowers with installation of 20
dissolved oxygen sensors; Stage two: Installation of posts for waste water
monitoring at the КНС and at the entrance to the treatment plant. Setting of suspended matter sensors, COD sensors, ammonium analyzers, phosphate analyzers
Results:
After installing a monitoring post for two streams of waste water, the effectiveness of waste water treatment was increased.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Podolsk WSC
Location:
Podolsk, Pionerskaya St., Building 1-B
Facilities:
Sewage treatment plant
Tasks:
Reconstruction of WWTP in Podolsk
Start and end dates:
2010-2012
Equipment and problem solving:
The project included the reconstruction and construction of biological wastewater treatment
plants with a capacity of 100 thousand m3 / day, and the control and regulation of the treatment process should be carried out automatically at
all key points of the treatment facilities. Within the framework of the complex reconstruction of the block of 100 thousand Podolsk WWTP were delivered:
8 oxygen sensors, 8 ISE ammonium / nitrates, 4 ORP sensors, 6 sensors, suspended substances, and two dual-channel phosphate analyzers for aerotanks,
as well as monitoring posts for ammonium, nitrates, phosphates, BOD, suspended in-in, pH, ORP and oxygen for incoming and treated wastewater.
Results:
Continuous monitoring of wastewater treatment.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Monitoring of storm sewage wells and chemical contaminated sewage for Nevinnomyssky Azot
Start and end dates:
2010-2014
Equipment and problem solving:
«Nevinnomyssky Azot» is a chemical company, the largest producer of nitrogen fertilizers and ammonia in Russia.
EcoInstrument Engineers installed in the wells sensors of nitrate and ammonium nitrogen,
pH and organic content (COD), which used for precision nitrogen analyzers with sample preparation systems for chemically contaminated effluents.
Results:
Constant and continuous monitoring of the condition of storm sewer wells and chemical polluted effluents in real time.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
«Ehrmann» plant in Moscow Region
Location:
Moscow region, Ramensky district, pos. RAOS, building 15
Facilities:
Treatment facilities
Tasks:
Optimization of treatment facilities, work monitoring of bio-cleaning at the Ehrmann plant
Start and end dates:
2011
Equipment and problem solving:
To optimize the work, it was decided to introduce industrial analyzers of dissolved oxygen and phosphorus:
HACH LDO sc and PHOSPHAX SC. In a framework of the project it was a necessary replacement of non-functioning oxygen sensors Endress + Hauser and installation
of a control system for phosphates also in the sludge mixture of aerotanks of local treatment facilities. The first weeks of operation of the Phosphax SC analyzer
showed very good convergence of industrial and laboratory phosphate monitoring results. An industrial analyzer measures every 10 minutes
or about 140 measurements per day, which guarantees detailed monitoring of the process and accurate dosage of ferric chloride.
Results:
Reduced aeration costs and protection from penalties by regulatory authorities.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
LLC «Eurohim»; OJSC "Phosphorite"
Location:
Leningrad Region, Kingisepp, OJSC "Phosphorite"
Facilities:
Treatment facilities
Tasks:
pH monitoring in effluents of various industries in the plant «Phosphorit»
Start and end dates:
2011
Equipment and problem solving:
«Phosphorit» Industrial Group is one of the leading manufacturers of phosphate fertilizers and feed phosphates. The specialists of our company was set multifaceted task of ensuring the monitoring of effluents of various industries in the same factory. The following equipment was installed as part of this project:
various digital differential pH sensors controlling the automatic sampling system for fixing samples exceeding the permissible pH.
Results:
Autonomous operational monitoring of wastewater composition for all facilities of the factory.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
WSC of Khabarovsk
Location:
Khabarovsk, Topographichesky Lane, 12
Facilities:
Drinking water facilities
Tasks:
Automatic water quality monitoring system of Tunguska water basin
Start and end dates:
2011-2014
Equipment and problem solving:
Our engineers prepared and supplied automatic
laboratories on the 2nd and 3rd ascent to control PH, chlorine, Turbidity, color, Concentration of TOC, iron, manganese, Ammonium.
Results:
The problem of automatic quality control of an underground water source has been solved.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
«Japan Tobacco industry»
Location:
Lipetsk region., Yelets, st. Novolipetskaya St., 1
Facilities:
Treatment facilities
Tasks:
Control of chemical phosphorus removal
Start and end dates:
2012
Equipment and problem solving:
Experts of our company installed phosphate control system in partially treated wastewater for the automatic dosing of a coagulant to local treatment facilities. Already the first weeks of operation of the Phosphax analyzer showed very good convergence of the results of industrial and laboratory control of phosphate content. An industrial analyzer takes measurements every 10 min or about 140 measurements per day,
which ensures detailed monitoring of the process and the exact dosage of iron chloride in automatic mode.
Results:
Significant (more than 20%) reduction in coagulant consumption, leveling of peak discharge situations.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
St. Petersburg WSC
Location:
Kavalergardskaya St., 42
Facilities:
Drinking water facilities
Tasks:
Introduction of automatic chemical control systems in the water supply system of the Southern Zone of St. Petersburg
Start and end dates:
2012
Equipment and problem solving:
The specialists of our company were tasked with creating chemical control systems, within the framework of which the following solutions were provided: Installation of turbidity sensors with wireless GPRS communication system on 32 water pump stations with dispatching by ModBus TCP/IP. Organization of 4 automatic laboratories on Moscovskaya
and Frunzenskaya water stations for monitoring pH, conductivity, hardness, turbidity, color, concentration of TOC, Al, Fe.
Results:
Continuous quality control of drinking water supply is ensured.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Vinnitsa WSC
Location:
Vinnitsa, Kievskaya Str. 173
Facilities:
Treatment facilities
Tasks:
Reconstruction of treatment facilities
Start and end dates:
2012-2013
Equipment and problem solving:
The work was conducted in the framework of the project of automation of wastewater treatment plants in Vinnitsa. The following equipment was delivered and installed by the specialists of our company: 22 oxygen sensors,
8 ORP sensors, 6 suspended solids sensors and 8 level sensors.
Results:
After the complete automation of treatment facilities, it became possible to reach 35% energy
savings and the efficiency of wastewater treatment increased by 45%.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Novokuznetsk WSC
Location:
Novokuznetsk, Builders ave., 98
Facilities:
Treatment facilities
Tasks:
Outflow monitoring of wastewater treatment plant
Start and end dates:
2013
Equipment and problem solving:
A ready-made post for monitoring of two streams of treated effluent, mounted in a thermo-container with the installation of: 2 combined sensors COD,
NO2 and NO3, 2 sensors of suspended solids, dual-channel ammonium analyzers.
Results:
Continuous discharge monitoring for compliance with the requirements of Federal law-219.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Environmental monitoring of sewages from metallurgical plant into the Inhulets River
Start and end dates:
2013-2015
Equipment and problem solving:
ArcelorMittal Krivoy Rog is a metallurgical plant, the largest metallurgical enterprise in Ukraine. Installation of autonomous environmental monitoring posts to monitor treated wastewater in the following indicators: pH, COD, total iron, chlorides, suspended solids,
petroleum products. Station №1 – Inhulets River. Station №2 – diversion channel with the Inhulets River.
Results:
Installation of these autonomous posts allowed carrying out continuous monitoring of wastewater quality,
which led to a reduction in the percentage of river pollution.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Novosibirsk WSC
Location:
Novosibirsk, Revolyutsii St., 5
Facilities:
Drinking water facilities
Tasks:
Monitoring chlorine dosing at a Novosibirsk WTP
Start and end dates:
2015
Equipment and problem solving:
Novosibirsk WSC is constantly upgrading equipment, researching and implementing the latest technologies to optimize the production processes of high-quality drinking water. Therefore, the specialists of our company did everything possible to help bring the process of monitoring drinking water to the highest level. Our engineers delivered and installed the following equipment: Supply of precision chlorine analyzers
СL17 for monitoring disinfection process at central drinking water treatment plant.
Results:
Continuous quality control of drinking water supply is ensured.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Balaam water supply station
Location:
Rep. Karelia, Sortavala, Valaam Island
Facilities:
Drinking water facilities
Tasks:
Control of incoming and purified drinking water, Balaam
Start and end dates:
2015
Equipment and problem solving:
Our experts have successfully installed reagent-less UVAS UV sensors for COD control, pH sensors, iron and color analyzers, used for monitoring of incoming and purified drinking water for a
number of critical parameters using equipment with minimal service requirements.
Results:
After the implementation of this project, a significant improvement in the quality of drinking water was achieved.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Pulp and paper plant "International Paper"
Location:
Leningrad region, Svetogorsk, Factory street., 17
Facilities:
Treatment facilities
Tasks:
Engineering & installation of sewage monitoring network.
Start and end dates:
2015-2016
Equipment and problem solving:
In a framework of the project our specialists installed 22 conductivity probes, COD- and TSS sensors on a sewerage network of the production
site of International Paper, Svetogorsk with connection to an existing SCADA.
Results:
After the implementation of the equipment the peak loads on local WWTP were significantly reduced; stability of biological stage was increased.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Nyuksenitsa village WSC
Location:
Nyuksenitsa village, Mechanizatorov st., 7
Facilities:
Drinking water facilities
Tasks:
Equipment for a new drinking water treatment plant
Start and end dates:
2016
Equipment and problem solving:
Our experts can offer a variety of solutions for the purification and quality control of drinking water, always adapting to the conditions of the client. Within the framework of this project on a new drinking water treatment plant was installed the following: Sensors of turbidity, color of water, chlorine dioxide, pH,
analyzers of alkalinity and aluminum, UV sensors of organic material with recalculation on COD-Mn.
Results:
It has provided continuous quality control of drinking water supply.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Moscow WSC (Kuryanovo, Lyubertsy)
Location:
Moscow Region, Lyubertsy, Octyabrsky Ave., 213a
Facilities:
Treatment facilities of Moscow WSC
Tasks:
Installation of equipment for incoming wastes control
Start and end dates:
2016-2017
Equipment and problem solving:
In frameworks of the project, for protection of the treatment facilities of Moscow WSC (Kuryanovo, Lyubertsy) from exceeding of critical parameters, our specialists installed 3 sets of equipment, including sensors for determination oil in water,
pH and ORP probes, and automatic water sampler for monitoring of incoming sewage.
Results:
Implementation of the equipment significantly increased efficiency of wastewater treatment.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Moscow WSC
Location:
Moscow, Pleteshkovsky Lane, 2
Facilities:
Treatment facilities
Tasks:
Organization of autonomous sewage monitoring post
Start and end dates:
2017
Equipment and problem solving:
For an autonomous monitoring drainage post with battery power and a wireless data transmission system, our engeneers installed in a well the following monitoring equipment: UVAS Organic Sensor,
FP360 Oil Product Sensor, Solitax Suspension Sensor, pH and Conductivity Sensors.
Results:
After installing a monitoring post, increased the
effectiveness of waste water treatment and achieved highest level of quality assessment of purification.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
St. Petersburg WSC
Location:
St. Petersburg; Kavalergardskaya St., 42
Facilities:
Treatment facilities
Tasks:
Equipment supply for the aerotanks modernization
Start and end dates:
2017
Equipment and problem solving:
As a solution for modernization our engineers supplied and installed the following complex of equipment: 8 LDO optical oxygen sensors with automatic cleaning system, 2 differential pH sensors and 2 Solitax sludge
concentration probes in one measuring network system based on sc1000 controller.
Results:
Such modernization allowed to return wastewater quality to the required quality standards.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Moscow WSC
Location:
Moscow, Pleteshkovsky Lane, 2
Facilities:
Drinking water facilities
Tasks:
Remote monitoring of chlorine and turbidity on nets
Start and end dates:
2017
Equipment and problem solving:
Our company specialists have found a solution to eliminate the problem of drinking water quality : development and installation of several nets of turbidity and chlorine control stations with wireless
GSM-communication based on turbidity sensors 1720E sc and total residual chlorine CLT10 sc.
Results:
Permanent quality control of drinking water supply for Moscow residents is ensured.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Novosibirsk WSC
Location:
Novosibirsk, Revolyutsii St., 5
Facilities:
Treatment facilities
Tasks:
Supply of 9 pumping stations with transfer of information to the control center
Start and end dates:
2017
Equipment and problem solving:
Chlorine analyzer Cl17, chlorine control panel CLF10, turbidity sensors Solitax, controller sc1000, 9 sets in total were supplied to control the total residual,
free residual chlorine and turbidity at 9 pumping stations with transfer of information to the control center.
Results:
Optimization of the control process for total residual, free residual chlorine and turbidity allowed increasing the efficiency of wastewater treatment.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Implemented lab projects
Complex laboratory solutions for any type of production are also a strong point of the company. Our highly qualified employees easily solve the tasks assigned to them, providing customers with the
most suitable solutions for their needs.
Equipping a laboratory complex of water quality control at the plant,
which produces its drinks, based on water, extracted directly from relic lakes
Start and end dates:
2010
Equipment and problem solving:
The main laboratory equipment for controlling the physicochemical parameters of water are HACH spectrophotometers, as well as electrochemical devices from Hanna Instruments and WTW. The quality control tasks for PET containers were solved by using AGR testing equipment, and such parameters as the sugar content in beverages in the final control phase are
performed on devices of world-famous manufacturers: Anton Paar, Bellingham and Stanley.
Results:
Special attention should be paid to the first-class microbiological laboratory, equipped with the most advanced analyzers and auxiliary equipment for detecting pathogenic microbes in water. EcoInstrument specialists used the available experience of both domestic science and the most advanced technologies of foreign manufacturers, which made it possible to keep the microbiological background under strict control during the
production process and up to the packaging of products.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.
Company:
Cargill Company
Location:
Novoanninsky, Pionerskaya St. 161
Facilities:
Cargill Oil Extraction Plant
Tasks:
Project for the construction of a laboratory complex at the Cargill Oil Extraction Plant
Start and end dates:
2015
Equipment and problem solving:
Ecoinstrument specialists equipped laboratories of the Cargill plant with all nesessery equipment, needed for comprehensive monitoring of all technological processes of production, strict control the entire production chain, as well as for
storing reagents and other laboratory materials and instruments.
Results:
Appropriate conditions were provided for conducting experiments and examinations, starting with the receipt of raw materials and ending with the release of finished products; verification of compliance with the requirements for the quality of materials, raw materials, semi-finished products and finished products for compliance with technical requirements, organoleptic and physico-chemical requirements of standards; ensuring the completeness and accuracy of the analysis,
the reliability, objectivity and accuracy of the results.
EcoInstrument LLC specializes in integrated problem solving, individually designed for each specific client. Our experts are highly-skilled and use only high-quality equipment and techniques to solve the client’s problem; perform the work clearly on time and provide the necessary support in case of any problems with the working capacity of the equipment.